Seperator-white-horizontal-01 Seperator-green-horizontal-01
Shadaw

Trench Excavation


District Sangali Village Renavi

District Sangali Village Renavi

District Sanglli Village Revangaon

District Sanglli Village Revangaon

District Sangli Village Ghoti Khu

District Sangli Village Ghoti Khu

District Sangli Village Ghoti Khu

District Sangli Village Ghoti Khu

House

10

Villages Impacted

Bar-Green
Excavator

8746

CCT Length

Bar-Green

A CCT (Continuous Contour Trench) is the most suitable technique for low rainfall, hilly or undulating terrain areas. Contour trenches are ditches dug along a hillside, which follow the contour of the hill and run perpendicular to the flow of water. The soil excavated from the ditch is used to form a berm on the downhill edge of the ditch. The berm is planted with permanent vegetation (native grass, legumes, etc.) to stabilise the soil and trap any sediment that would overflow from the trenches; thereby preserving fertile soil from being washed away.

Project_Map

Project Impact

Dumper

16493

Quantity Of Dumpers

Bar-Green
Crowd

13472

People Benefited

Bar-Green
Water drop

164930cubic m

Water Quantity

Bar-Green

Click here to download the project details.

Get In Touch

If you wish to contribute to our journey, you can donate to our cause or join in our efforts by volunteering. If you wish to get in touch with us, please write to us at connect@naammh.org